| Cycle time | 30 s / pc |
|---|---|
| Operators | 1 for tray loading |
| Process | Loading / positioning / inner bore deburring / cleaning / automatic unloading |
| Installed at | Jiangsu |
Dedicated equipment for burrs in the inner bore of aluminium die castings. Cleaning and automatic unloading follow deburring, so residual burrs do not affect downstream assembly.



